A&A Painting is currently completing industrial coating work at the Trail Wastewater Treatment Plant as part of the RDKB Columbia Pollution Control Centre upgrade.
Scope includes surface preparation, priming, and application of high-performance coating systems to concrete walls, ceilings, floors, and structural components within active process areas. Work also includes specialized coatings on doors, frames, chemical-resistant finishes.
Coating systems include block fillers, epoxy floor sealers, and high-gloss polyurethane finishes specified for long-term performance in a corrosive, high-moisture environment.
Work is being carried out in phases in coordination with the general contractor and site management team to maintain safe access and continuous plant operation.
This project highlights A&A Painting’s experience working in active municipal and industrial environments, where strict safety protocols, coordination with multiple trades, and adherence to coating specifications are essentials.
Our Team maintained consistent quality and progress while working within the operational demands of the wastewater treatment facility.


